Glossary. Updated 4 November 2026
Retest window
Why does this matter to ASM buyers?
A retest window turns an informal promise to check later into an operational agreement. It links the maintenance schedule to the next permitted observation, which matters when production systems restrict scanning or require owner approval. The window is not the same as the remediation deadline or the total exposure window.
Before a trial or remediation exercise, specify what event starts the window, which check should run and who handles an inconclusive result. The tool should show whether the retest is scheduled, completed, blocked or overdue. A finding should not appear verified merely because the appointed time passed or the ticket moved to a resolved state.
Choose a real maintenance task and follow it through the agreed window. Confirm that the retest uses a comparable endpoint and vantage point, or explains any deliberate change. If a temporary control blocks the original check, record that outcome precisely. It can support reduced external exposure without establishing that the underlying patch was installed or every possible access path disappeared.